  1. Playbooks: Real-World Scenariosmatch

    The duct is bigger than 96 square inches. What do we install?

    Plain English: Large duct openings through the perimeter need a permanent physical barrier, an inspection port and acoustic treatment. An alarm sensor is not a substitute. Action plan Run the numbers. Bars or grilles are required when an op …

  2. Penetrations, Utilities & Life Safetymatch

    Vents and ducts: the 96 square inch and 6 inch trigger

    Ducts are the largest openings in most SCIF perimeters. Tech Spec §3.G.7 sets a size threshold above which a duct must be physically barred. The rule. "All vents or duct openings that penetrate the perimeter walls of a SCIF and exceed 96 s …

  3. Intrusion Detection & UL 2050 / Extent 3match

    Common IDS findings at accreditation

    … plenum connects to non-SCIF space. Settle this on the pre-construction checklist. Ducts. Openings larger than 96 square inches need bars, grilles or metal baffles, unless one dimension is under 6 inches (3.G.7.c). IDS is not listed as a sub …

  4. Glossarymatch

    Man-bars

    Steel bars of at least ½-inch diameter, welded 6 inches on center, that protect perimeter duct and vent openings over 96 square inches unless one dimension is under 6 inches (Tech Spec 3.G.7). See: Penetrations, Utilities & Life Safety

  5. Intrusion Detection & UL 2050 / Extent 3match

    The 12 numbers every SCIF IDS installer should know

    … least 12 characters and changed every six months, unless PIV/CAC authentication is used. Duct and vent openings larger than 96 square inches need bars, grilles or baffles. IDS is not listed as a substitute. Field note: Put all twelve on the …

  6. Penetrations, Utilities & Life Safetymatch

    Man-bars, grilles and metal baffles

    When a duct penetration meets the size trigger, Tech Spec §3.G.7 allows bars, one of several grille options, or permanently installed metal baffles. Protection Tech Spec / UFC specification Man-bars "minimum of 1/2 inch diameter steel, wel …

  7. Perimeter Construction & Vaultsmatch

    Tech Spec vaults vs. FED-STD 832 Class A, B and C

    … same as the walls Class 5 vault door FED-STD 832 also covers openings: those exceeding 96 square inches and over 6 in. in the smallest dimension require 9-gauge expanded metal mesh or rigid steel bars at least 1/2 in. in diameter, welded 6 …

  8. DISA Traditional Security STIG & PDSmatch

    How the STIG relates to ICD 705 inspections

    … lock on the primary door (3.E.2) Same lock family Openings in Perimeter Exceeding 96 Square Inches Bars, grilles or baffles over 96 in² (3.G.7.c) Same threshold BMS on Perimeter Doors; Interior Motion Detection UL 634 Level II HSS and moti …

  9. Perimeter Construction & Vaultsmatch

    Vault construction under Tech Spec 3.C.5

    … eight inches of reinforced concrete" Compressive strength "of at least 2,500 pounds per square inch (psi)" "steel reinforcing rods, a minimum of 5/8 inches in diameter, positioned centralized in the concrete pour and spaced horizontally and …

  10. DISA Traditional Security STIG & PDSmatch

    Example physical and technical security requirements

    … 2 V-245798 … Vault/Secure Room Storage Standards - Openings in Perimeter Exceeding 96 Square Inches 3 V-245802 … Secure Room Storage Standards - Balanced Magnetic Switch (BMS) on Perimeter Doors 4 V-245803 … Secure Room Storage Standa …

  11. Traps & Common Failuresmatch

    Penetration and utility traps

    Every opening is a forced-entry, acoustic and TEMPEST question at the same time. Trap Why it fails Fix Source type Duct over 96 sq in, with no dimension under 6 in, lacking bars, grilles or baffles Tech Spec 3.G.7 Bars, grille or baffles pe …

  12. Penetrations, Utilities & Life Safetymatch

    HVAC serving a SCIF

    … than any other trade. Most of the issues are settled by where equipment sits and how ducts cross the wall. Location. "Utilities and general building support spaces should remain outside of the secure areas" (UFC 4-010-05 §3-3.3.2). Air han …

  13. Penetrations, Utilities & Life Safetymatch

    Common penetration and utility failures

    … after finishes. These are the findings that recur. Failure Requirement it breaks Basis Ducts over 96 sq in (no dimension under 6 in.) without bars, grille or baffles Tech Spec 3.G.7 Primary No inspection access port, or port outside without …

  14. Facility Types, Modes & Overseas Categoriesmatch

    Vaults

    … vault GSA-approved modular vault meeting AA-V-2737 Reinforced concrete Minimum eight inches of reinforced concrete; compressive strength rating of at least 2,500 psi; steel reinforcing rods at least 5/8 inch diameter, centered in the pour, …

  15. Acoustics & Sound Maskingmatch

    Doors, windows and ducts: the usual weak points

    Walls are rarely the reason a SCIF fails acoustically. Doors, glazing and ductwork usually are. Doors. Use STC-rated door assemblies: door, frame, seals, threshold and drop seal tested together (UFC 3-4.6.1). Lab rating no less than STC 50 …

  16. Penetrations, Utilities & Life Safetymatch

    Inspection access ports and IDS on ducts

    Bars and baffles hidden inside ductwork must be inspectable. Otherwise nobody can confirm they are still there. Access port requirements. Option Requirement Inside the perimeter (preferred) "an access port shall be installed inside the secu …

  17. Acoustics & Sound Maskingmatch

    Transducers vs speakers: doors, walls, windows and ducts

    … fits. Speakers move air. They fill air paths: plenums, ceiling voids, raised floors and ducts. Surface transducers vibrate the structure they are mounted on: door frames, studs, glazing, duct walls and pipes. The building element itself bec …

  18. RF Shielding, Penetrations & Installer Methodsmatch

    Honeycomb vents for HVAC

    The problem. An HVAC duct is a large hole in the shield. A 12-inch-wide rectangular opening has a cutoff near 0.5 GHz (5.9 / 12), so frequencies above that pass through it freely. The solution. A honeycomb vent splits the opening into many …

  19. Playbooks: Real-World Scenariosmatch

    Our IDS failed the walk test. How do we find and fix the problem?

    … was run correctly. Each trial is four consecutive steps at one step per second, about 30 inches (± 3 inches) per step, with 3–5 second pauses. The alarm must activate on at least three of every four trials "made by moving progressively t …

  20. Penetrations, Utilities & Life Safetymatch

    Pipes, conduit and sprinkler lines

    Pipes and conduit are smaller than ducts but far more numerous, and most are metal. The physical rules are simple (minimize, seal, finish). The TEMPEST rules apply only when the CTTA's review calls for countermeasures. DoD treatment when TE …

  21. Intrusion Detection & UL 2050 / Extent 3match

    Maintenance, semiannual testing and false alarm limits

    … and are escorted. Recurring testing (7.D.3): "Semi-annual IDS testing shall be conducted to ensure continued performance." Test Method and pass criterion Motion Each trial is four consecutive steps at one step per second, about 30 in ± 3 i …

  22. RF Shielding, Penetrations & Installer Methodsmatch

    The cutoff formula and a worked example

    … 0.87. Attenuation falls to zero as f approaches fc. Worked example: a 1-inch tube, 5 inches long, air-filled Step Calculation Result Diameter 1 in = 2.54 cm D = 2.54 cm Cutoff 17.6 / 2.54 fc ≈ 6.9 GHz Length in diameters 5 in / 1 in L/D = …

  23. Doors, Locks & Security Containersmatch

    Door fabrication requirements

    … report that most SCIF doors fail accreditation because of installation, not defective products. Set frames plumb, level and square before the wall is finished, because a racked frame causes binding deadbolts, gaps at seals and misaligned do …

  24. Playbooks: Real-World Scenariosmatch

    Our architect put a sprinkler main through the SCIF. What now?

    … Review directs otherwise, UFC 3-4.11.2 says to ground metallic sprinkler pipe within 6 inches of the penetration using No. 4 copper wire to the building grounding system. In an RF-shielded room, use the shield vendor's engineered pipe waveg …